Tuesday, July 29, 2008

Instrument boards



I got a chance to see what she looked like with the instrument boards in place. I liked them to they became part of the build, at least as they are tried in place for the fit test. Seats installed in place always need a place to park it,while you fly it and something to look at so I chose instruments from the seat as a nice thing to look at on occasion while flying

Friday, July 11, 2008

final decision on the door

Well I got it all glued in supported side to side and top to bottom, and still haven't cut it.

I had an EAA tec counselor Herb visit and check the project and he cautioned against cutting the upper longeron for the door.

Herb is a structural engineer and carpenter he suggested against it and that was enough for me. So its frame, supported, glued in and solid so now I am not going to cut it.

No sense going against good advice especially when it confirms my own concerns.

Thursday, July 3, 2008

built the seat base frames


Went according to plan and built the seat base frames for the front and rear pits. Didn't like the way the rear pit came out and decided to rebuild it later on in the cycle. I got that done, and I like it much better. I also added a few touches of my own to make the seat more usable. I figure its my airplane so I can build it the way I want it. Ahhhh yes the beauty of being an independent Piet builder.

seat backs clamped into place


I got the seat backs clamped into place, the door supported and the load from the upper longerons redistributed, I got the front seat base in and working on the rear pit seat bracing. Plus I got some varnishing done.

Finally vacation time arrives

I saved all my vacation time for last 2 weeks in December, I can take all my vacation plus extend due to the Holiday season and really get building, so that's what I did. I got the seat backs mucked up and cut in the seat feet, control passages and seat base support. We are cooking now and no more builders block, nothing but sawdust and glue.

seats and partitions

I started with the rear seat, just locating where the backrest was supposed to go for the rear and forwad pits.

The Block continued

All summer with the exception of some sanding I did nothing but stare at the wood. I came to the realization that after sever days and no change, that unless I did the building it was always going to look just the way I left. No work during the summer.

As fall approaches I am sanding more and enjoying it lessbut still waiting for my project to speak to me, she finally did and I was re energized and ready to go. Plus I thought that cutting the seats out couldn't hurt anything so I started to build the seat areas.

Following the first seat cuts she spoke to me and the seats led me to more areas to build and so I did.